Match the complete line arrangement
Send the tail material, length, specified strength basis, eye arrangement and current maker details. Identify the parent line and connection hardware. The ordered tail must match the vessel’s system requirements, including stiffness and the end connection, so the deck team can review a proposed replacement against the arrangement on board.
Keep labels with their documents
We pick and pack by line station or requisition number. Keep the manufacturer identification and relevant documents with the correct tail and connectors. If a proposed item differs from the requested specification, SVC gives the deck department the details to review before dispatch.
What if the old tail tag is unreadable?
Send the mooring arrangement or line-management record and photographs of the connection. The vessel’s documented specification provides the basis for checking a replacement.
Also serving nearby ports
SVC also supplies ships calling at Cua Lo, Vung Ang and Son Duong. Put the line station and receiving point on the requisition for each port.
Send the requisition
Send the line arrangement, tail specification, connector details and the receiving point. See the Vietnam ship chandler service for the wider service scope.
