Assess a frozen or non-starting cargo monitoring station
A frozen display or a workstation that fails to restart can interrupt access to cargo tank readings. Send the TankRadar system and workstation references, the software version if known, the start-up symptoms and the checks already made by the ship’s electrician. Tell us whether any other station still displays tank readings. Our technician assesses the workstation and reports whether the symptoms point to a repairable workstation fault or warrant preparing a replacement.
Send photos of the workstation label and external connections. The vessel should identify any affected monitoring functions and the cargo operation or bunkering window. The chief officer or designated engineer defines when the station can be taken out of service.
Check the replacement against the installed TankRadar system
A higher-specification computer can still be unsuitable if the installed software, licence, operating system or communication interface cannot run on it. SVC checks the software generation, licence or activation requirements, interface cards or adapters, display outputs and available connections against the vessel’s system information. Retain the original hardware references and include details of the onboard installer and backup media.
We present the compatible hardware options and identify any software, licence or interface changes that require the vessel or manufacturer to approve. Confirm those changes before buying a different workstation. A proposal for the workstation does not include replacement of tank sensors or field equipment unless those items are specified separately.
Agree backup, restoration and acceptance checks
SVC verifies with the vessel which configuration, software and records the existing backup contains and whether it is usable for the proposed replacement. If the old computer cannot start, agree how to protect the old drive and what can be restored from the existing backup before committing to a change. The vessel controls access, credentials and the release of any operational records.
After installation, we perform the agreed checks with the designated ship’s officer. The test list can include application start-up, communication with the installed monitoring system, the expected tank identifiers and display of representative readings against a vessel-approved reference. Alarm or interface tests follow the approved vessel procedure and operating window. The handover lists the backup used, functions checked and outstanding items for the vessel or manufacturer.
Plan transport and attendance around the Port Klang call
State whether the vessel will call at Northport, Southpoint or Westports, or will be at an agreed anchorage during bunkering. Give the actual receiving point, ETA, ETD and boarding contact. SVC prices the workstation, installation and testing, and land transport to the agreed handover point as separate lines. Any vessel transfer or boarding arrangement is agreed for the specific call.
For supplies that can travel with the same call, see the Port Klang deck stores guide and the Port Klang provisions worklist. The Malaysia ship supply directory lists other receiving locations.
Can we specify a faster workstation than the original?
Yes, if it is compatible with the installed TankRadar software, licence and communications hardware. Send the current workstation reference and available backup details first. We identify what must be confirmed before ordering the replacement and record any required software change in the proposal.