SVC Marine carried out lashing and securing work at Dung Quat, Quang Ngai, for equipment and industrial project cargo shipments, with its local team and selected cargo operation vendors.
Case study
- Location
- Dung Quat, Quang Ngai, Vietnam
- Work type
- Cargo lashing and securing
- Cargo
- Equipment and industrial project cargo
- Published
SVC Marine supported project cargo lashing and securing work at Dung Quat, Vietnam, for selected equipment and industrial cargo shipments.
The job involved reviewing cargo requirements, mobilizing our local team, following port operations, checking practical securing needs and keeping the cargo side updated before shipment.
Dung Quat is an important industrial and project cargo area in Central Vietnam. Cargoes shipped from this area may include equipment, machinery, steel structures, fabricated units, industrial materials and other breakbulk or project cargoes requiring proper lifting, stowage, lashing and securing before sea transportation.
02
Case Overview
SVC Marine reviewed the cargo requirement, mobilized our local lashing team and followed the job with port, vendor and vessel-side parties.
Project cargo lashing is not only manual work. It is part of cargo risk control. If the cargo is not properly secured, the shipment may face cargo shifting, cargo damage, vessel safety risk, insurance dispute, loading delay or rejection by the vessel’s master, chief officer or cargo surveyor.
03
Cargo and Operation Details
- Location: Dung Quat, Quang Ngai, Vietnam
- Cargo type: equipment / industrial project cargo
- Shipment type: breakbulk / project cargo shipment
- Required work: cargo lashing and securing
- Field execution: SVC Marine local team and selected cargo operation vendors
- SVC Marine role: team mobilization, port follow-up, vendor control and job reporting
04
The Operational Requirement
The cargo may also require yard access, trucking schedule, crane readiness, lashing materials, cargo survey attendance, vessel approval and port operation follow-up.
The key requirement was to make sure the cargo could be secured properly for sea transportation. This included reviewing cargo condition, checking practical lashing requirements, mobilizing our local resources and keeping the relevant parties informed during the job.
05
SVC Marine’s Role
- Receiving and reviewing the cargo operation requirement
- Checking cargo information, photos and practical work scope
- Mobilizing our local lashing and securing team
- Following work timing with the cargo side and local parties
- Clarifying cargo securing requirements before execution
- Checking practical needs for dunnage, chocking, chains, wires, shackles or turnbuckles
- Keeping job records and photos where required
- Providing marine and port operation follow-up in Vietnam
06
Why Cargo Lashing Matters for Project Cargo
Improper cargo securing may lead to:
- Cargo shifting during sea passage
- Cargo damage or deformation
- Damage to nearby cargo
- Damage to vessel deck, hold or fittings
- Loading delay due to re-lashing requirement
- Surveyor or master rejection
- Insurance or cargo claim dispute
- Additional port cost, standby time or demurrage exposure
07
Typical Lashing and Securing Considerations
- Cargo dimensions and gross weight
- Center of gravity
- Base footprint and contact area
- Available lifting and securing points
- Deck or hold stowage position
- Dunnage and chocking requirement
- Chain, wire, shackle and turnbuckle arrangement
- Welding or sea fastening requirement where applicable
- Protection against vibration, rolling and impact
- Surveyor, master or chief officer requirement
08
Our Local Team at Dung Quat
SVC Marine helps clients move from enquiry to execution by checking the requirement, assigning our local team, following site progress and keeping the work status visible during the job.
Our field work may include:
- Lashing team mobilization
- Crane or lifting vendor follow-up
- Surveyor attendance where required
- Port and agent communication
- Marine vendor attendance where required
- Photo records and job status updates where required
- Work follow-up between cargo owner, logistics provider, vessel side and vendors
09
Connection with Project Cargo Shipping
SVC Marine supports project cargo shipment from Vietnam through:
- Cargo data review
- Shipment method review
- Vessel matching and chartering support
- Port and vendor follow-up
- Lifting and loading support
- Cargo lashing and securing work
- Floating crane attendance where required
- Marine technical backup during cargo operation
10
Connection with Shipping from Dung Quat Port
For cargo shipped from Dung Quat, the freight solution should be checked together with loading arrangement, lifting method, cargo securing, vessel suitability, port readiness and discharge port capability.
For port-specific support, please visit our Shipping from Dung Quat Port page.
11
Plan a project cargo lashing enquiry
Send a cargo list with dimensions and gross weights, available centre-of-gravity and securing-point information, stowage drawings, photographs, the terminal, ETA and loading window. Identify any welding or sea-fastening scope and the requirements of the vessel or attending surveyor.
Talk to SVC Marine
Please provide your company details and the vessel requirement or work scope. Acceptance is subject to verification and confirmation by SVC Marine.