Ballast Tank Inspection with Turkish Lloyd in Vietnam

SVC Marine inspected the ballast-tank structure with the Turkish Lloyd surveyor and brought the findings into the drydock repair scope in Vietnam.

Case study

Published
Ballast tank inspection during a drydock project in Vietnam
Ballast tank inspection during a drydock project in Vietnam

01

Inspection inside the tanks

SVC Marine inspected the ballast tanks on behalf of the owner with the Turkish Lloyd class surveyor. The inspection examined internal hull structure directly: plating, frames, stiffeners, brackets, weld seams and earlier repair areas.

02

Condition and repair scope

The inspection covered corrosion, steel wastage and coating breakdown. SVC Marine reviewed the findings and class comments with the vessel crew and repair team to define the steel repair items for the drydock programme.

03

Part of the drydock record

During docking, SVC checked internal tank condition and reviewed the required steel repairs and class items with the vessel crew and repair team. The tank findings formed part of the wider drydock worklist.

04

Connected technical work

Tank inspection, steel renewal and drydock attendance are connected work scopes. For an enquiry, send the tank arrangement, previous thickness measurements if available, class comments, known defects and intended docking window.