EN

Home / SVC Marine

SVC Marine

Project-cargo lashing at VinMetal Port

SVC's local crews carry out project-cargo lashing and securing at VinMetal Port in Ha Tinh. Our crews prepare the materials, fit lashings and securing components, and record the installed work against the cargo arrangement, bringing hands-on deck-work experience to the loading operation.

We work across VinMetal, Son Duong and Vung Ang, bringing practical knowledge of the port area to berth-side attendance. We plan the crew, securing materials and onboard work around the assigned berth, vessel side and cargo-working sequence.

Project cargo secured with lashing frames in the hold
Equipment cargo with securing frames and lashings in the hold.
Trucks bring hot-rolled coil (HRC) under the quay crane for loading
Trucks bring hot-rolled coil (HRC) under the quay crane for loading.
Hot-rolled coil (HRC) is stowed in the hold during night loading
Hot-rolled coil (HRC) is stowed in the hold during night loading.
SVC's crew cuts off all the previously installed lashing-frame supports so the vessel is ready for the equipment cargo
SVC's crew cuts off all the previously installed lashing-frame supports so the vessel is ready for the equipment cargo.

01

Start with the cargo unit and its securing position

We review each cargo unit and its securing position before preparing the lashing work. Send dimensions, weight, centre-of-gravity information where available and the planned deck or hold position. Mark the securing points and any restrictions affecting access to them. A packing-list description alone may not define the work around a large or irregular unit.

The vessel’s loading sequence matters: securing one item can obstruct access to another. Explain when each unit will be in its final position and which areas remain available for the lashing crew. Keep the cargo list and the latest drawing revision together.

02

Distinguish the securing plan from its installation

Our crews install the specified securing arrangement with its approved work instructions. Engineering calculations, approved sea-fastening design and installation labour are separate scopes. Tell SVC whether the request is to install an established arrangement or to quote additional design work before installation can be defined.

SVC identifies the proposed lashing materials, fabrication and onboard work against that arrangement. Changes in cargo weight, position or securing points need review before they are treated as a minor material substitution. The work record should show the arrangement actually installed.

03

Steel cargo and industrial equipment securing at VinMetal

SVC carries out onboard lashing and securing for steel cargo and industrial equipment at VinMetal Port. Our crews work from the actual steel coils, bundled sections or machinery packages, their weights and dimensions, final stow positions and available securing drawings. Steelworks deliveries and cargo loaded aboard the ship remain separate worklists.

We prepare and install the agreed securing components against the vessel's accepted arrangement, with the loading sequence, access to securing points, fitting or hot-work scope and handover checks kept together. The installation worklist identifies what will be fitted and checked on deck, while the securing design and cargo-handling appointment retain their own defined scope.

04

Match the securing crew to the assigned berth

Our local team organises VinMetal deck attendance around the assigned terminal or pier, berth reference and vessel side. We prepare the crew and materials for the time the cargo will be in position, with access to the securing points kept clear of other units being handled. A shore-plant delivery address and an onboard securing position go to their respective receivers.

The cargo-securing handover records the installed arrangement, checks and outstanding tasks for that attendance. Routine replenishment stays on the separate departmental list covered by our VinMetal ship stores and provisions service, so the crew can receive its stores without confusing them with lashing materials or project packages.

05

Define materials, hot work and access

We prepare lashings, securing components and the access needed for installation. Keep a material purchase separate from a request for welding, fitting or tensioning work. Proposed equivalents require acceptance for the intended use.

For any hot work, identify the vessel’s working conditions, permitted work area and the required arrangements with the responsible vessel and terminal parties. Attendance is confirmed for the actual VinMetal berth and work window; a cargo booking does not itself establish permission for every securing task.

06

Inspect and record the installed work

We inspect the installed work and record its condition before handover. Photographs should identify the relevant securing location and outstanding items. Note any obstruction, changed connection or incomplete task before the handover is closed.

The Dung Quat lashing record linked below is a real work example from another port. Its cargo, date and location remain there. The VinMetal enquiry requires its own cargo drawings, appointment and completion record, with no assumption of a standing terminal or cargo-owner contract.

07

Related services and work records

Explore our related technical work and services and the wider service scope. Find the other supply and repair services for your port call in the North Central service directory.

08

Also serving Son Duong, Vung Ang, Cua Lo

SVC also provides this service at Son Duong, Vung Ang, Cua Lo. Our teams work with each vessel’s terminal, schedule and receiving or working arrangements across the North Central ports.

09

Questions about Project-cargo lashing at VinMetal Port

Can SVC quote lashing from a cargo list alone?

The list is a starting point. Supply dimensions, weights, final positions, securing drawings and the requested installation or design scope so the materials and labour can be defined.

Does lashing attendance establish approval of the securing design?

No. Design review, calculations, installation and acceptance must be identified separately. The completion record states the work actually performed and checks agreed for that appointment.

Which berth and vessel side need attendance?

Give the assigned berth or pier, the vessel side available to the crew, the cargo loading sequence and the planned securing period. Include the latest cargo arrangement and installation instructions so the lashing team, the goods receiver and any shore-project contact work to their own defined scope.

10

Request a VinMetal service quotation

Email the SVC cargo desk with cargo dimensions and weights, securing drawings, the appointed work scope and installation window. Include the actual VinMetal berth or nominated position and the latest vessel schedule. SVC returns the proposed scope and outstanding confirmations for acceptance.

Talk to SVC Marine

Please provide your company details and the vessel requirement or work scope. Acceptance is subject to verification and confirmation by SVC Marine.