Identify the intake before the dive
Send the intake plan or mark the high and low sea chests on a hull sketch. Note which side is affected and whether the engineers have reported an intake issue. Identify other openings near the work area so the dive plan can address each relevant system with the vessel.
Make the findings specific to the grating
We record the grating face, visible bar and fastener condition, and the type and position of any external blockage. The engineer receives a reference for each view and any unobserved area. External cleaning is quoted as a separate work item when requested, with suction and machinery arrangements agreed for the work.
Will the report show the inside of the sea chest?
The external dive documents the grating and visible area through it where conditions permit. Arrange a separate internal inspection with the vessel if the cooling-water issue requires evidence beyond the external view.
Also serving nearby ports
SVC divers also carry out underwater inspections for vessel calls at Nghi Son, Son Duong and Hon La. Use the intake identifiers and report format in the worklist for the next call.
Send the worklist
Send the intake sketch, side, observations, vessel position and requested video coverage. See the Cua Lo underwater work record for the wider service scope.

