Read the worklist against the approved procedure
Send the process, consumable classification, diameter, maker or approved equivalent and required documents. Tell us which items must remain in sealed packs and identify the welding procedure where the vessel specifies one. State the quantity per diameter and work area so the order can be checked before dispatch.
Retain labels and batch references
We keep maker labels and requested batch or lot references with the corresponding packages. Separate electrodes, wire and related parts on the list. The repair team can then verify the consumable against the procedure and follow the maker’s storage requirements before use.
Can a different diameter or brand be sent instead?
Send the proposed change to the person responsible for the repair procedure. SVC confirms the accepted specification before preparing the replacement line.
Also serving nearby ports
SVC also supplies ships calling at PTSC Nghi Son, Dai Duong Nghi Son and Cua Lo. Send the worklist revision and identify who will receive the consumable packs.
Send the requisition
Send the welding process, consumable specification, quantity and required documentation. See the ship steel repair service for the wider service scope.

