Repair · Published Oct 2026
Marine boiler repair at Cam Pha: tube plugging and welding
SVC Marine repaired leaking composite-boiler water tubes at Cam Pha by fabricating, fitting and welding tube plugs. The job covered 12 initial plugs and 36 additional plugs, with no leakage recorded after fitting.








