Define the assembly before ordering
Send the fuel service, working pressure and temperature, hose length, bore and end connection drawings. Identify the flange standard or coupling type at both ends. Include any vessel requirement for electrical continuity, test documentation or hose identification.
Check handling and end protection
State how the hose is stowed, handled and connected and provide the minimum bend requirement from the vessel specification. We verify the proposed assembly against the requisition and pack it with ends protected. Keep test documents and assembly markings together for the vessel’s receiving check.
Can the vessel send an old hose photo?
Yes. Include the markings and photos of both ends, with the service and operating specification. The photo is particularly helpful when the original fittings differ from each other.
Also serving nearby ports
SVC also supplies ships calling at Son Duong, Vung Ang and Cua Lo. State the connection types and receiving arrangements for each assembly.
Send the requisition
Send the hose duty, assembly length, both connection details and required documents. See the hose and connection work record for the wider service scope.
