If the incinerator will not ignite, trips after starting or shows a waste-oil pressure alarm during a Vung Ang call, send SVC Marine the alarm sequence and the available repair window. Our technicians inspect the appointed burner, oil-delivery, atomizing-air and control items, then record what they actually repair and check.
01
Start with the failed sequence, not a replacement part
Identify the incinerator maker, model and equipment number. Send the exact alarm text or code, the step at which the start sequence stops, and the crew's observations before shutdown. State whether the problem appears on diesel-oil ignition, during waste-oil changeover, after a period of firing or when the unit is stopped. The control drawing, maker's manual pages and recent maintenance record help SVC distinguish a control signal from a burner, pump or valve fault. An alarm name alone is not a diagnosis.
SVC's earlier incinerator case documented mis-fire and low waste-oil pressure in a separate Vietnam attendance. The technicians found an I/O-card relay defect, no delivery from one pump outlet and an atomizing-air solenoid valve that did not open properly. The recorded repair included the I/O-board DC circuit; pump repair or replacement and valve renewal were recommendations for the next decision. Those findings show why different parts of a similar alarm sequence need separate dispositions. They are not findings from a vessel now at Vung Ang.
Photos from SVC work records

02
Separate ignition, oil and atomizing-air work
For ignition or flame-loss complaints, SVC can inspect the nominated burner and ignition components, flame eye or photo cell, sensor wiring and the relevant control response. For low oil delivery, the appointed scope can cover the selected fuel-oil or waste-oil pump, suction condition, filters, valves, pressure indication and accessible pipe fittings. For an atomizing-air complaint, identify the measured air condition, the particular solenoid valve and its electrical command. These branches may meet at the burner, but they should not be priced as one undifferentiated overhaul.
Send the maker part references and spares already aboard. SVC identifies the component and the approved repair or renewal before opening it; a board, pump and valve may need different skills, parts and outage time. The quotation distinguishes initial fault finding, cleaning, electrical repair, mechanical or pipe work, spares and any workshop task. If an inspection reveals a further defect, SVC records that finding and seeks agreement on the added scope before calling it repaired.
03
Keep the protections and safe work boundary intact
The crew should identify the electrical isolation, oil and air isolation, hot surfaces, cooling time and access arrangements for the nominated unit. SVC agrees the diagnostic boundary with the chief engineer before touching the control board or burner. A flame safeguard, temperature or draft limit, pressure switch and emergency stop are protective functions, not obstacles to bypass for ordinary operation. A suspected faulty protection item is documented for repair and the relevant check, with the unit left under the vessel's control until the required return-to-service decision.
The actual maker's operating manual and vessel procedures determine the sequence and values for the installed incinerator. SVC does not assign a universal oil pressure, temperature or test duration from a port guide. The required witness or acceptance authority, including class or flag where applicable, belongs in the work order before the check.
04
Plan the Vung Ang receiving position and work window
Vung Ang Port and the Son Duong terminal are distinct receiving locations. For a Vung Ang enquiry, give the actual berth or anchorage, ETA, ETB and ETD, cargo-work restrictions, boarding arrangement and the hours when the incinerator can be isolated. State whether a part may leave the vessel and when it must return. SVC checks attendance, access and the time for the selected inspection or repair against that position; the port name alone does not grant access or an operating-test window.
If the next receiving point is Son Duong, Hon La or Nghi Son, send the updated berth, anchorage and remaining worklist. The equipment findings and part references can follow the enquiry, but boarding and permission to perform a firing check must be reviewed for the new location. Repair attendance during a port call is separate from authorization to burn waste or operate the unit there; any operating check depends on the vessel's procedures and applicable local restrictions.
05
Record the repair and the checks actually made
After the appointed work, the completion note should identify the alarms reported, inspection points, observed readings, failed components, parts changed and the condition after repair. Agree with the chief engineer which non-firing checks and, if permitted, operating or flame-safeguard checks are required under the maker's procedure. Record the actual sequence and result, the person witnessing it and any check deferred because of access, safety or port restrictions. SVC separates completed repairs from recommendations, outstanding faults and parts still required.
The wider ship-repair service covers a combined engine-room worklist. The machinery guide separates incinerator, boiler and compressor equipment so each receives its own references, isolation and handover. Send the incinerator defect through the repair team rather than merging it into an unrelated machinery item.
06
Questions before an incinerator attendance
Does a mis-fire alarm mean the burner must be replaced?
No. Give the start sequence, exact alarm and available oil, air and electrical observations. SVC checks the agreed ignition, flame-detection, delivery and control branches before proposing a part. The earlier case had more than one defect, but it does not diagnose a new unit.
Can SVC repair a pump and the I/O circuit in the same port call?
Both can be put on one appointed worklist if the equipment references, people, spares, isolation and available hours allow it. The quotation and completion note identify the electrical and pump tasks separately; finding a board fault does not prove the pump has been repaired.
Can the incinerator be fired for testing alongside the berth?
Do not assume so. The chief engineer must establish the vessel's operating procedure and applicable port restrictions before any firing check. If it cannot be performed safely or lawfully during the call, SVC records the completed repair and the operating check left open for an authorized opportunity.
What if the safety interlock itself is faulty?
Identify the device and its observed signal under controlled diagnosis. The repair scope must restore the protection and include the applicable maker-defined check before a return-to-service decision. SVC does not recommend bypassing protective functions for normal operation.
What should I send for a Vung Ang quotation?
Send the exact receiving position and schedule, maker/model and circuit drawing, alarm history, panel and component photographs, oil and air observations, spares aboard, required witness or records, and the hours available for isolation and return. Email the SVC repair team with the items already known; missing readings can be identified for inspection rather than invented.