


01
Fabricate the replacement around the existing windlass
A replacement brake weight has to match the existing arrangement. For a similar job, send the drawing or measured dimensions, material requirement and photographs of the component and its installation. Our fabricators prepare the agreed part for the vessel.
02
Engine-room pipe renewal during the port call
The same project included engine-room steel pipe renewal. For another pipe worklist, identify the line, dimensions, material, flange connections and access so our pipe-fitters can prepare the appointed renewal scope.
03
Marine fabrication at Son Duong and nearby ports
Send the part and pipe requirements to [email protected] with the berth, ETA and work window. See ship repair at Son Duong and steel repair in Vietnam. Our teams also undertake commissioned fabrication work at Vung Ang and Hon La.
Talk to SVC Marine
Please provide your company details and the vessel requirement or work scope. Acceptance is subject to verification and confirmation by SVC Marine.
