Scrubber overboard pipe repair at Quy Nhon Anchorage
SVC Marine's divers and repair team renewed scrubber overboard piping at Quy Nhon Anchorage while the vessel remained afloat.
Case study
- Published









01
Underwater isolation
Our divers plugged the overboard openings. The corresponding valve could then be removed from the engine room side to inspect the internal condition of the piping.
02
Pipe renewal in the engine room
The damaged pipe section was cut at the existing weld seam. SVC Marine fitted a prefabricated replacement pipe and new flange, prepared the bevels and completed TIG welding. The published work record also identifies the use of BELZONA 1212.
03
Removal of plugs and testing
After the repair work, the underwater plugs were removed and testing was completed. The original report records the scrubber overboard piping operating in good order after the test.
04
One underwater and onboard repair scope
The case connects diver attendance, valve access, prefabrication, engine room pipe work and final testing. For a similar repair, send overboard arrangement drawings, pipe material and dimensions, photographs, defect details, vessel location and ETA.