EN
Bow damage before repair

Home / Vietnam port coverage / Hai Phong

SVC Marine · Ship Repair & Ship Supply

Ship Repair & Supply at Hai Phong, Vietnam

Onboard repairs and vessel supplies for your port call. Send the berth or anchorage, ETA and your worklist or requisition to the relevant SVC team.

Plan your port call with SVC

Start with the receiving location and vessel schedule, then send the requirement to the right team.

  1. 01

    Port & schedule

    Port, terminal, berth or anchorage; ETA and ETD.

  2. 02

    Repair worklist

    Defect, photographs and the available work window.

  3. 03

    Supply requisition

    Items, quantities, units and preferred delivery date.

Wrapped metal components secured in a pickup truck
Packaged components prepared for transfer to a vessel.
Container stacks and gantry cranes at a terminal in Hai Phong
Container terminal operations in Hai Phong.
Vessel crane hoisting a pallet of wrapped metal components
Hoisting packaged components aboard a vessel.
Pallet of wrapped metal components lifted alongside a vessel
Onboard delivery of packaged components.
Wrapped metal components secured together on a vessel deck
Packaged components on the vessel deck.
Two technicians working at the base flange of deck equipment
Onboard work at a deck equipment flange.
Stern and mooring lines of a commercial vessel alongside
Vessel alongside in Hai Phong.
Port information and service details

A repair request in Hai Phong needs the terminal or shipyard berth, rather than the city name alone. Send the defect, access arrangements and the period available alongside so our team can plan onboard work and any workshop stage.

01

Repair requirements at Hai Phong

  • crane and deck machinery defects
  • electric motor and generator faults
  • pipe leaks and steel renewal

02

Onboard work and completion records

Our repair teams attend the vessel and carry out the appointed steel, pipework, mechanical or electrical scope. Our divers undertake the appointed underwater work. Inspection findings, progress photographs, test results and outstanding items are recorded in the SVC job report.

Work at berth or anchorage is confirmed against the actual vessel location, safe access, port permissions, isolation arrangements and the time available. The quotation defines the work, materials, deliverables and exclusions. Additional work is quoted for approval.

03

Send the repair requirement

Email [email protected] with the port and terminal or anchorage, ETA and ETD, defect description, equipment maker and model, photographs or drawings, and the proposed worklist. State any class or survey attendance requirement. SVC will review the scope and issue a quotation.

Repair or supply for your next port call?

Send the repair worklist to [email protected] or the supply requisition to [email protected].