Our repair squad attended onboard at Quy Nhon Anchorage on 10-13 Feb, in order to repair the two overboard pipes as per below work scope:
+ Underwater job:
After divers plugging, relevant overboard valve was be removed from E/R side and inspection was be performed to check pipes internal condition.
+ Inside E/R job:
Proceed with cutting of the big diameter pipe portion at the position of the already existing welding seam, and fitting a new, pre-fabricated by us, pipe with new flange. Prefabricated pipe is DN250 SCH120 (ID=230.12mm / OD=273.1mm / t=21.44mm).
Photos & Videos report:
Videos underwater plugging pipes by wooden wedge.
 
  
 
Cutting off scrubber overboard pipes damaged.
 
  
 
Connecting flange with pipes, bevelling pipe and prepare pre-fabricating pipes.

 
  
Adjusting pre-fabricating pipes, TIG Welding was applied.
 
  
 
Completed welding.

 
  
BELZONA 1212 was fitting.
 Comleted removing wedge and testing successfully crubber overboard pipes in good order.
Comleted removing wedge and testing successfully crubber overboard pipes in good order.


 
					 
					